Volkswagen Crafter plant in Września
Construction site: Volkswagen Crafter plant in Września
Investor / Employer: Volkswagen Poznań Sp. z o.o.
Implementation: I Q 2015 – IV Q 2016
Scope of works: comprehensive installation of high-current electrical systems, design works, construction of a switching station with a 110kV cable line
Mercedes-Benz engine factory in Jawor – Hall H3
Construction site: Mercedes-Benz engine factory in Jawor – Hall H3
Investor: MERCEDES-BENZ Manufacturing Poland Sp. z o.o.
Implementation: I Q 2018 – II Q 2020
Scope of works: installation of high-current systems
Mercedes-Benz battery factory in Jawor
Construction site: Mercedes-Benz battery factory in Jawor
General Contractor / Employer: TAKENAKA EUROPE GmbH Sp. z o.o.
Implementation: II Q 2019 – III Q 2020
Scope of works: performing internal high-current electrical works, including a workshop design
UMICORE cathode materials plant in Radzikowice
Construction site: UMICORE cathode materials plant in Radzikowice
General Contractor / Employer: Siemens sp. z o.o.
Implementation: I Q 2020 – III Q 2020
Scope of works: installation of high-current systems
Bridgestone manufacturing plant in Poznań
Construction site: Bridgestone manufacturing plant in Poznań
Investor: Bridgestone Poland Co.
Area overall: 14,000 sqm
Cubature: 167,000 cbm
Implementation: continuous cooperation 1998 - 2005
Scope of the works: high current services including the medium and low voltage mains, as well as the indoor and outdoor lighting. Lightning arresters were installed on 6 metre high posts. In 2005 we have finished electrical works in halls 7 and 8.
Mahle manufacturing plant in Krotoszyn
Construction site: Mahle manufacturing plant in Krotoszyn
Investor: Mahle Polska Ltd.
Area overall: 70,000 sqm
Cubature: 700,000 cbm
Implementation: continuous cooperation since 2003
Scope of the works: high and low current services including the medium and low voltage mains, busbars, medium and low voltage switchgear, and the casting foundry line power supply networks.
Gedia production plant in Nowa Sól
Construction site: Gedia production plant in Nowa Sól
Investor: Gedia Nowa Sól
Implementation: continuous cooperation since 1998r.
Area overall: 26,300 sqm
Cubature: 315,000 cbm
Scope of the works: installation of high-current and low-current systems