Electronic industry

Electronic industry

Construction site: LG Philips LCD Monitors Production Facility in Kobierzyce

Investor: LG – Philips Group

Employer: GS E&C Poland

Overall area: 130 000 m2

Implementation: II Q 2006 – II Q 2007

Scope of works: Our works included installations in the main production building "Module Building" and other "Administration, Utility, Boiler, Dining, Security, 110kV Station.

Scope of high-current works: Laying MV supply cables from 110KV building to other buildings, laying LV cables in buildings, delivery and installation of cable routes, delivery and installation of equipment (switches and sockets), installation of luminaries (standard and emergency type), installation of the evacuation lighting system, installation of power and light switchboards, connection of production lines, delivery and installation of earthing and lightning protection system.

Scope of low-current works: Delivery and installation of sound and TV system, delivery and installation of telephone network, delivery and installation fire alarm system.
We also installed outdoor lighting system (site) and cable ducts.

Construction site: LCD TV-sets Assembly Facility – FUNAI in Nowa Sól

Investor: Funai Electric Poland

Customer: Zueblin Polska

Overall area: 11 650 m2

Implementation: I Q 2007- II Q 2007

Scope of works: 2 x MV 20 kV supply lines, 20/04 kV transformer station, double-transformer station 2x1250 kVA, 2-section MV switchgear with automatic transfer switching devices, 2-section LV Rinn switchgear (6-pole), cable racks and cable channels, internal supply lines leading mostly in cable channels, counter panel, emergency and evacuation lighting, plug-in sockets and socket sets installation, computer plug-in sockets installation

Technological and power devices installation, including: testing area room supply, ventillating and air-conditioning cabinets supply, gas boiler-room supply, compressors room supply, intermediate sewage pumping station supply, intermediate fire pumping station supply, supply system and internal installations in 2 lodges, supply system and battery-electric trucks charging station, roof grooves heating installation, compensatory connections installation.

Installation of outdoor lighting, including sidewalks and internal roads lighting.
Communications installations, including structural wiring, access control systems with worktime logging, fire automation system, monitoring system.

Construction site: Building the Kimball Electronics factory in Sady near Poznań

Employer: Hochtief

Implementation: III Q 2008 – II Q 2009

Scope of works: making the electrical and telecommunications indoor and outdoor systems, and drawing up the plans of the electrical systems, the construction and the engineering design, making the building power supply from the cable connector at the parcel border, including delivery of the medium-voltage switchgear, transformers and the low-voltage switchgear, making and delivery of the building switchgears, cable routes, Indoor Feeder Systems, 3-phase power supply systems and sockets, lighting installation, grounding system and lightning protection system and outdoor lighting installations, low-current systems, i.e. CCTV (closed-circuit television), Intrusion Detection System, Outdoor IT networks.

The website uses cookies

As part of our website, we use cookies to provide you with services at the highest level, including in a manner tailored to individual needs. Using the website without changing the cookie settings means that they will be stored on your end device. You can change your cookie settings at any time. More details in ours "Cookies policy".