Food Processing
LECH Brewery in Poznań
Construction site: Lech brewery in Poznań
Investor: Kompania Piwowarska Co. Lech Browary Wielkopolskie
Area overall: 11,000 sqm
Cubature: 73,000 cbm
Implementation: continuous cooperation in 1998–1999
Scope of the works: high current services including the pneumatics of the fermentation and filtering tanks, as well as the intermediate beer buffer tanks, yeast plant, storage, brewing, central cleaning plant, CO2 recycling, cooling machine room, lighting, power mains, lightning arresters, and earthing.
Unilever liquid soups production plant in Poznań
Construction site: Construction of liquid soups production plant, Unilever in Poznań
Investor: Unilever Poland S.A.
Overall area: 7500 m2
Implementation: I Q 2006 - II Q 2006
Scope of works (Construction of liquid soups production building):
LV main switchgear for main supply station, modernization of 15 kV MV switching station, execution of cable channel routes for food industry acid-resistant steel, cable distribution from main MCC switching station to division switchgear, together with control systems installation
Scope of works (related to permanent co-operation with Unilever company since 2003):
Running modernizations of lighting, power and communications installations in division buildings, as well as modernization of existing switching stations for production lines in Poznan facility
Wrigley chewing gum factory in Poznań
Construction site: Wrigley chewing gum factory in Poznań
Investor: Wrigley Poland Ltd.
Area overall: 9,000 sqm
Cubature: 50,000 cbm
Implementation: continuous cooperation 1994-1995
Scope of the works: high current services including the No2 1600 kVA transformers, mains power systems and lighting, along with the outdoor lighting.
Hochland production plant in Sovata, Romania
Construction site: Hochland production plant in Sovata, Romania
Investor: HOCHLAND Romania SRL
Implementation: II Q 2006 – IV Q 2006
Scope of works (V.2006 – VI.2006):
Installation of 5-pole LV switchgear, capacitor batteries, own purpose switching station, execution of connections between LV switching station and transformers using 2 500 A bus-bridge, cabling cables supplying evaporator, lighting, 3-phase and socket installation, execution of cable routes, lightning arrester installation and potential compensation installation.
Scope of works (XII 2006): execution of external lighting installation on production and technological buildings elevation, execution of parking lighting installation, execution of installation supplying parking and plant entry gates.