Food Processing

Food Processing

Construction site: Lech brewery in Poznań

Investor: Kompania Piwowarska Co. Lech Browary Wielkopolskie

Area overall: 11,000 sqm

Cubature: 73,000 cbm

Implementation: continuous cooperation in 1998–1999

Scope of the works: high current services including the pneumatics of the fermentation and filtering tanks, as well as the intermediate beer buffer tanks, yeast plant, storage, brewing, central cleaning plant, CO2 recycling, cooling machine room, lighting, power mains, lightning arresters, and earthing.

Show reference

Construction site: Construction of liquid soups production plant, Unilever in Poznań

Investor: Unilever Poland S.A.

Overall area: 7500 m2

Implementation: I Q 2006 - II Q 2006

Scope of works (Construction of liquid soups production building):
LV main switchgear for main supply station, modernization of 15 kV MV switching station, execution of cable channel routes for food industry acid-resistant steel, cable distribution from main MCC switching station to division switchgear, together with control systems installation

Scope of works (related to permanent co-operation with Unilever company since 2003):
Running modernizations of lighting, power and communications installations in division buildings, as well as modernization of existing switching stations for production lines in Poznan facility

Show reference

Construction site: Wrigley chewing gum factory in Poznań

Investor: Wrigley Poland Ltd.

Area overall: 9,000 sqm

Cubature: 50,000 cbm

Implementation: continuous cooperation 1994-1995

Scope of the works: high current services including the No2 1600 kVA transformers, mains power systems and lighting, along with the outdoor lighting.

Show reference

Construction site: Hochland production plant in Sovata, Romania

Investor: HOCHLAND Romania SRL

Implementation: II Q 2006 – IV Q 2006

Scope of works (V.2006 – VI.2006):

Installation of 5-pole LV switchgear, capacitor batteries, own purpose switching station, execution of connections between LV switching station and transformers using 2 500 A bus-bridge, cabling cables supplying evaporator, lighting, 3-phase and socket installation, execution of cable routes, lightning arrester installation and potential compensation installation.

Scope of works (XII 2006): execution of external lighting installation on production and technological buildings elevation, execution of parking lighting installation, execution of installation supplying parking and plant entry gates.

The website uses cookies

As part of our website, we use cookies to provide you with services at the highest level, including in a manner tailored to individual needs. Using the website without changing the cookie settings means that they will be stored on your end device. You can change your cookie settings at any time. More details in ours "Cookies policy".