Other

Other

Construction site: Paroc production plant in Trzemeszno

General Contractor / Employer: Przedsiębiorstwo Usług Budowlanych Broster Marek Brodecki & Mirosław Stec Sp. j.

Implementation: III Q 2019 – I Q 2020

Scope of works: installation of high-current systems and telecommunication ducts

Construction: LM Glasfiber propeller blade factory in Goleniów

Investor: LM Glasfiber company

Implementation: III Q 2008 – I Q 2009

Area: 11 500 m2

Within the scope of the works, our company makes the high-current systems, including delivery and assembly of: the equipment of the transformer station (the 6-field DRAWA medium-voltage switchgear and the XEnergy low-voltage main switchgear), and delivery and assembly of sub-switchgears

and makes:
medium-voltage and low-voltage outdoor networks; area lighting; Indoor Feeder; lightning protection system; grounding system; socket installations and 3-phase power supply systems; indoor lighting installation.

as well as low-current systems, including:
structured cabling; phone cabling; fire alarm system; intrusion and access control system; gas detection.

Construction site: Philip Morris Production Facility in Cracow

Investor: Philip Morris

Implementation: 1999 - 2002

Overall area: 3 500 m2

Production building cubature: 35 000 m3

Warehouse overall area: 3 500 m2

Warehouse cubature: 22 700 m3

Scope of works: 0.4 kV LV main switching station, division switchgears, UPS’s, internal power supply lines, 3-phase, lighting, earthing and compensatory connections installations, emergency power supply systems, low current (fire-fighting and control) installations.

Construction site: Enlargement of Sanitec Koło Facility

Investor: Sanitec Kolo

Employer: Budimex-Dromex S.A.

Implementation time: III Q 2006 - II Q 2007

Overall area: 30 000 m2

Scope of works:
high current installations, including: MV switchgear, 1000 and 630 kVA transformers, LV and object switchgears, cable channels and internal supply lines, lighting installation, 3-phase current and plug-in sockets installation, earthing and lightning arrester installations

Show reference

The website uses cookies

As part of our website, we use cookies to provide you with services at the highest level, including in a manner tailored to individual needs. Using the website without changing the cookie settings means that they will be stored on your end device. You can change your cookie settings at any time. More details in ours "Cookies policy".