Power generation
Modernisation of the Flue Gas Desulphurisation System in units No. 8-12 at PGE Górnictwo i Energetyka Konwencjonalna S.A., Bełchatów Power Plant Branch
General Contractor / Employer: RAFAKO S.A.
Implementation: II Q 2020 – III Q 2020
Scope of works: delivery, assembly and commissioning of MV and LV electric switchgear for FGD in units No. 9 and No. 10
Modernisation of 6 Kv Z1, WC1, WC2, P4 and 24/220V DC TPS/P4 switchgear (with design documentation) at Kozienice-Świerże Górne Power Plant
Investor: ENEA Wytwarzanie Sp. z o.o.
Implementation: IV Q. 2019 – III Q 2020
Scope of works: Modernisation of 6 Kv Z1, WC1, WC2, P4 and 24/220V DC TPS/P4 switchgear (with design documentation)
Construction of a gas-steam unit at Żerań Heat and Power Plant
Zamawiający: Mitsubishi Hitachi Power Systems Europe GMBH
Implementation: II Q 2020 – IV Q 2020
Scope of works: installation of electrical systems
Construction of a new unit with a capacity of 496 MW at Turów Power Plant in Bogatynia
Zamawiający: Mitsubishi Hitachi Power Systems Europe GMBH
Implementation: II Q 2020 – IV Q 2020
Scope of works: installation of electrical systems
Modernisation of the 6kV BA auxiliary switchgear at Karolin CHP Plant II
Inwestor/Zamawiający: Veolia Energia Poznań S.A.
Implementation: II Q 2018 – I Q 2019
Scope of works: delivery and assembly of a new 6kV switchgear - section A and B – 44 bays in total
Replacement of a 6 RKW switchgear at Karolin CHP Plant
Inwestor/Zamawiający: Veolia Energia Poznań S.A.
Implementation: III Q 2016 – IV Q 2017
Scope of works: delivery and assembly of a new RKW 6kV ODRA 12 switchgear – 17 bays in total
Flue Gas Desulphurisation System II at Ostrołęka B Power Plant
General Contractor / Employer: RAFAKO S.A.
Implementation: I Q 2019 – III Q 2020
Scope of works: design, delivery, assembly and commissioning of the electric solutions in the “turnkey” system for the Flue Gas Desulphurisation System II for units No. 1, No. 2 and No. 3 at the Ostrołęka B Power Plant
Siekierki Heat and Power Station
Construction site: building the wet flue gas desulfurization system of Siekierki Heat and Power Station in Warsaw
General contractor: Rafako Boiler Factory
Implementation: IV Q 2008 – IV Q 2011
The general scope of works performed by our company: The basic and the engineering design of the power evacuation and the wet flue gas desulfurization system; electrical systems - power evacuation – performed in two stages; electrical systems for the wet flue gas desulfurization system – performed in two stages.
Konin Heat and Power Station
Construction site: Installation of electrical systems for the CFB boiler in Konin Heat and Power Station
Employer: EL PAK Sp. z o.o.
Implementation: I Q 2011 - III Q 2011
Scope of works: Installation of appliances (transformers, inverter cabinets, UPS, DC switching station), supply and installation of cable ducts, installation of cables and fire protection sealing and measurements, supply and installation of earthing devices, cable structures, as-built documentation
Flue gas desulfurization installation – Ostroleka B
Construction site: Flue gas desulfurization installation in power station Ostrołęka B
Investor: Powerhouse Group – Ostrołęka S.A.
Employer: Boiler Production Facility RAFAKO
Implementation: III Q 2006 - IV Q 2007
Scope of works: Delivery and installation of 20 poles for 6 kV main Odra switchgear in Flue Gas Desulfurization Facility (produced by ZPUE Elektromontaz Poznan), 19 poles for 0.4 kV Warta switchgear (produced by ZPUE Elektromontaz Poznan).
Delivery and installation of 6 kV cable lines, 0.4 cable lines, electrical installations for flue gas desulfurization systems, general electrical installations for buildings.
Pątnów II Power Station
Construction site: Pątnów II Power Station 460 MW (megawatt) power electric unit
Investor: Power Station - Elektrownia Pątnów II
Employer: SNC LAVALIN Polska sp. z o.o.
Implementation: III Q 2007 - III Q 2008
Scope of works: Control and measuring equipment, automatic installation, cable routes, installation of sockets and power.